Is that the one with the overdone angles and such?
-----
I was just wandering around wikipedia (not for uni) and came across this Clearways page. Anyway, I went to the cityrail website and saw something of great interest.
From Cityrail: " Currently, trains from Campbelltown to the City via the Airport & East Hills Line experience congestion through sharing the existing double track with all-stations trains.
Two additional tracks from Kingsgrove to Revesby will create a completely separate all-stations route to the City via the airport (see Clearway 4). As a result, Campbelltown express trains will be separated from all-stations trains after leaving Revesby and the express trains will operate via Sydenham. This will greatly improve reliability of both routes. The service patterns on the Airport & East Hills Line can be simplified and more structured. "
"• Clearway 4 will divide the existing East Hills Line into two independent clearways and will see the creation of the all-stations to the City via the airport route starting from Revesby as detailed in Clearway 3 above. This route will be known as the Airport Line. These projects are fundamental in achieving reliability on these routes.
• Estimated Clearway cost: $183 million.
• Macdonaldtown turnback, under construction, operational in 2005.
• Homebush turnback and platform, planned construction 2005-2007.
• Revesby turnback and platforms, planned construction 2006-2008.
• Macdonaldtown stabling, planned construction 2006-2008"
"• Clearway 3 provides capacity to facilitate express services from the Campbelltown area to the City via East Hills.
• Estimated Clearway cost: $340 million.
• Extra tracks, Kingsgrove-Revesby, planned construction 2006-2009.
• Extra platform at Macarthur, planned construction 2008-2010.
• Clearway 3 will also benefit from the Sydenham-Erskineville upgrade. "
All Campbelltown trains will now be Campbelltown express! All day every day! That means every train from Central to Campbelltown or vica versa will now stop at none of the stations before Revesby! Oh joy! Then again, it won't be operational until 2008, or something along those lines. Ah well, sounds good anyway.