An extensive report in two parts.
Part 1 covers the history of bridge design and materials, engineering innovations, environmental impacts etc.
Part 2 is my own design portfolio detailing the design and construction of my own bridge model. These were then tested (Not covered in the report, since testing occurred after submission) and the design managed to hold 22kg before breaking due to insufficient glue application (still salty about that one)
Received a mark of 82%, with my overall internal rank being 1st
Have fun with civil structures, especially the calculations
Wordcount: 9600
Part 1 covers the history of bridge design and materials, engineering innovations, environmental impacts etc.
Part 2 is my own design portfolio detailing the design and construction of my own bridge model. These were then tested (Not covered in the report, since testing occurred after submission) and the design managed to hold 22kg before breaking due to insufficient glue application (still salty about that one)
Received a mark of 82%, with my overall internal rank being 1st
Have fun with civil structures, especially the calculations
Wordcount: 9600